Structural flooring & RSJ fitting in Crystal Palace. SE19 London

Another local job in South East London SE19

The project including:

  • locate reading the floor damage, locate leaks from the main water connection
  • completely demolition the floor including floor joists
  • make foundation and build the wall using engineering brick to support new floor structure in the middle the room
  • build new floor structure using 8×2 timber,  fitting to the walls by masonry wall hangers, all the timber protect in the wall joints using DPM membrane
  • laying plywood  on the top of existing new build floor
Share on facebook
Share on google
Share on twitter
Share on linkedin